01. Plan

Infrastructure Strategy

Workload, power and cooling assessed before the first rack is ordered — so the architecture scales without rework.

Cluster sizing, power and cooling envelopes, fabric selection and storage topology are decided up front and written down. The plan is what the deployment team builds against, and what the operations team inherits.

An empty white data hall before fit-out — raised floor tiles marked out for rack positions, overhead busway and containment running the length of the room.
Scope

What the engagement covers

  • Workload profiling and cluster sizing

  • Power and cooling envelope per rack

  • Network fabric selection — InfiniBand or RoCEv2 / RDMA

  • Storage and interconnect topology

What gets decided

Four decisions, made before anything ships

DecisionWhat we specify against
GPU platformRack-scale GPU systems, GPU servers and general-purpose servers, across multiple generations
Network fabricInfiniBand, or RoCEv2 / RDMA over Ethernet
StorageEnterprise storage, sized for model training workloads
Facility envelopePower and cooling per rack, assessed against data centre readiness

Every decision is written down before procurement. The plan is what the deployment team builds against, and what the operations team inherits.

Get started

Tell us what you need to run.

Share your workload requirements, market focus, and timeline. Our expert teams across Taiwan, Singapore, Malaysia, and Indonesia will design the optimal compute service—leveraging our existing GPU capacity or building a dedicated infrastructure tailored to your needs.

Talk to our team →