Infrastructure Strategy
Workload, power and cooling assessed before the first rack is ordered — so the architecture scales without rework.
Cluster sizing, power and cooling envelopes, fabric selection and storage topology are decided up front and written down. The plan is what the deployment team builds against, and what the operations team inherits.
What the engagement covers
-
Workload profiling and cluster sizing
-
Power and cooling envelope per rack
-
Network fabric selection — InfiniBand or RoCEv2 / RDMA
-
Storage and interconnect topology
Four decisions, made before anything ships
| Decision | What we specify against |
|---|---|
| GPU platform | Rack-scale GPU systems, GPU servers and general-purpose servers, across multiple generations |
| Network fabric | InfiniBand, or RoCEv2 / RDMA over Ethernet |
| Storage | Enterprise storage, sized for model training workloads |
| Facility envelope | Power and cooling per rack, assessed against data centre readiness |
Every decision is written down before procurement. The plan is what the deployment team builds against, and what the operations team inherits.
The rest of the lifecycle
Deployment & Integration
How the capacity you rent got built: rack mount, cabling, OS and driver provisioning, network configuration — four phases, one point of contact. Also delivered as a standalone project.
03. ConnectStructured Cabling
High-density fibre is where a GPU cluster quietly loses throughput. Our own engineers do it — tested, labelled and documented — on the estates we run and on yours.
Tell us what you need to run.
Share your workload requirements, market focus, and timeline. Our expert teams across Taiwan, Singapore, Malaysia, and Indonesia will design the optimal compute service—leveraging our existing GPU capacity or building a dedicated infrastructure tailored to your needs.
Talk to our team →